Posts

Showing posts from March, 2015

I'd like to use Checkvist but to start off I have to import a large outline from a Google Doc. I can't find a way...

I'd like to use Checkvist but to start off I have to import a large outline from a Google Doc.  I can't find a way to do this and maintain the hierarchy, etc.  I've tried text export from Google (loses hierarchy) and even imported into OmniOutliner and then exported in OPML, and that didn't work either. Ideas?  Thanks - matt

When a task is edited in multiline mode, window deactivation (eg.

When a task is edited in multiline mode, window deactivation (eg. changing focus to other application) finishes the editing mode (the texts are fixed and saved; the text cursor is disapeared). This annoying behavior happens in Firefox and Safari, but not in Chrome (on Mac OS X).

Publish does not seem to be working.

Image
Publish does not seem to be working. I can Share successfully but the Publihsh link to the HTML page just shows the Title and "Loading data ..." forever.

Could I get some help on repeating dates please, they're confusing me! Have checked the help and discussion posts.

Could I get some help on repeating dates please, they're confusing me! Have checked the help and discussion posts. Firstly I assume I should not have a 'dd' due date if I'm using 'dr' date repeat? 1. I have a task which I've set the first instance for today, repeated every 2 weeks from the due date. I've left the 'generate before' empty. If I then go to today's task and complete it (spacebar)  it gets crossed off but stays with today's date. 2. I also have a 2-week repeating task with 2-day advance generation where the completed occurrence is last week - it's still shows crossed out, and just has the 'circle arrow' icon without a date - is that expected? 3. Similarly I have a 2-week repeating task with a 2-day advance generation where the first date for next week, and that does show the next due date. Kinda seems inconsistent but I'm not sure I'm using it right. The 'dr' dialog shows the next 3 dates correctly

Is it just me or is there currently a problem with offline access on Android?

Is it just me or is there currently a problem with offline access on Android? I have tried with the newest versions of Chrome, Firefox and Opera but they all show just a blank page (no error message) as soon as I am offline. The test with Firefox was after a fresh install of the browser so it shouldn't be related to old data on my side. I also tried another website with offline access and it worked fine. Any ideas what else i could try?

Hi

Image
Hi,  Ok, here's the screenshot. You see the checkboxes are now off-level..  moreover, i liked the black and sharp-angled look. can i change that via css? (i'm a subscriber) thx!

Hi Checkvist

Hi Checkvist Thanks for the new feature of the list-style option (none, bullets, checkboxes, numbers)! if i set it to checkboxes and set a branch to bullets "[*] bla bla", the bullet is on top of the checkbox. The result i expected was, that on the sub-branches, all checkboxes would be replaced by the bullet. Maybe there is a possible optimization... Thanks and greetings!

One more CSS snippet for those who use CSS customisation.

One more CSS snippet for those who use CSS customisation. Now you can add icons with tags, and hide the tags afterwards . Many thanks to +Edo Amin Elan for the idea.  https://checkvist.com/p/42953 (at the bottom of the list)

Hi

Hi, Just rediscovered Checkvist and moving all my tasks from my current task manager. Wished I could find a combination of GQueues' keyboard functionality, and Workflowy's outlining zoom functions, and looks like I've now found it. I did have one feature suggestion that I haven't seen in any other similar apps, which would make a big difference to me - it would be an extension to 'mm'. When I move an item to another list I'd like to select its position within the destination list. So possibly within the 'mm' dialog I could then navigation through that list to select the parent where the source item would go. All in one action and I stay focused on the list I was using. And it doesn't affect current 'mm' functionality as the default would be the root of the chosen list. Rationale: I capture things in an Inbox list which is a combination of tasks, information, future reminders, links etc. I then have separate lists for each project. I now -

Hello Checkvist

Hello Checkvist When changing to print view, focused list gets un-focused. I only want to print a specific branch. Is that a bug or intention? Also, Tags have grey fonts when printed, whereas on screen they're white and much more readable. thanks for considering these issues. Sergej

Hello Checkvist.

Hello Checkvist. Script send2checkvist isnt't working in Firefox for me. Refresh command doesn't help, also password reenter. But it works on my home pc. Please, see a video below. https://dl.dropboxusercontent.com/u/72061596/2CheckvistLogin.mp4 https://dl.dropboxusercontent.com/u/72061596/2CheckvistLogin.mp4