How do I turn off the behaviour: If all subtasks are closed, close the parent task automatically.
How do I turn off the behaviour: If all subtasks are closed, close the parent task automatically.
↳ This doesn't work at all with the way I use CheckVist. As I only make my tasks lists from the 3rd level, and never want my level 2 and 1 nodes to be closed.
↳ This doesn't work at all with the way I use CheckVist. As I only make my tasks lists from the 3rd level, and never want my level 2 and 1 nodes to be closed.
This can be changed by going into the options (the small "gear" icon) and selecting "More options", which will bring you to the personal settings... uncheck the second item, "Close parent task when the last child is closed".
ReplyDeleteI would say thank you from him :)
ReplyDeleteThank you all!
ReplyDelete